Soldering the hot water valve into place.
The hot water has been moved! Woo-hoo!
So, due to scheduling conflicts with "Plumber Jim", we decided to fly solo on finishing the move of the cold water supply line and the PVC waste pipe. Were we up to the challenge??
I think so!!!!
The hot water has been moved! Woo-hoo!
So, due to scheduling conflicts with "Plumber Jim", we decided to fly solo on finishing the move of the cold water supply line and the PVC waste pipe. Were we up to the challenge??
I think so!!!!
First off, the difficult part about the cold water was that we couldn't drain the pipe. So, in order to rid the pipe of this unwanted water, we had to call in ....the Cardio-plumber! Who knew you could cath a copper pipe???!!!
After ALOT of intense torching we're in the home stretch!
Pipes are moved!
Floor is patched.
After ALOT of intense torching we're in the home stretch!
Pipes are moved!
Floor is patched.
Despite the Omni-Grip fumes clouding our brains we managed to stick all 33 square feet of tile to the plywood floor.
Tony worked his magic with the trowel, smoothing and scraping the adhesive into place...
Tony worked his magic with the trowel, smoothing and scraping the adhesive into place...
While I carefully laid the tiles into place...
Viola! Tile is stuck - what a team!
And now for the grout...
And finally... the Throne!
Viola! Tile is stuck - what a team!
And now for the grout...
And finally... the Throne!
Stay tuned for the installation of the sink and vanity....